Built Solid Home Services
← All remodeling

Whole-Home Remodeling

When you need to remodel the kitchen, primary bath, and main level at the same time, the scope and schedule are fundamentally different from a single-room project. One estimate, one schedule, one point of contact.

Range

$120K–$500K typical

Timeline

4–9 months typical

Licensed • Insured • Locally Owned in Crystal Lake, IL • Serving 222 Communities Across Northern IL and Southern WI

Whole-Home Remodeling

How it works

Our process, step by step.

  1. Step 1

    Whole-home walk

    Full house walk, photograph every room to be touched, discuss priorities and phasing. Free.

  2. Step 2

    Scope and phasing plan

    Proposal with phase-by-phase budget and timeline. Decide what's Phase 1 vs Phase 2.

  3. Step 3

    Design and selections

    All rooms and selections locked in one pass so trades don't have to revisit decisions.

  4. Step 4

    Execution

    Sequenced demo, rough-in, and finish by room so you can still live in the house if that's the plan.

  5. Step 5

    Handoff

    Punch list walk of every room, photos, warranty paperwork.

Recent projects

Before & after (coming soon)

Before

Whole-Home Remodeling — before

After

Whole-Home Remodeling — after
Real project photos coming soon.

Before

Whole-Home Remodeling — before

After

Whole-Home Remodeling — after

Frequently asked questions

Can I live in the house during a whole-home remodel?
Sometimes. It depends on which rooms, whether the kitchen is touched, and your tolerance for construction noise. We'll give you an honest read during the walk.
Is a whole-home remodel cheaper than doing rooms one at a time?
Usually yes — about 10–20% — because we only mobilize once, only schedule trades once, and don't have to rework adjacent finishes each time.

Free in-home estimate

Remodeling, additions, or a bigger project? We'll come out, walk the space, and give you a real scope and timeline.

No spam, no sales pressure. Just a real conversation about your project.