Skip to main content
BUILT SOLIDHOME SERVICES
← All remodeling

Kitchen Remodeling in Crystal Lake and nearby communities.

A kitchen remodel is a real construction job, not a long handyman visit. We plan it around how you cook and use the room, sort out demolition and the order of the work, and put the cabinets, counters, layout, and any plumbing or electrical in writing before anything gets torn out.

What's included

You know what's included before work starts.

  • Down-to-the-studs kitchen remodels, from demolition through finishes
  • Cabinets, countertops, backsplash, and finishes
  • Flooring, drywall, paint, trim, and hardware
  • Layout changes, checked for load-bearing walls, plumbing, and electrical first

Before the proposal

The questions that shape the plan.

  • Where the appliances go and how the room should work
  • What's behind the walls and under the floor now
  • Cabinet and finish choices, and how long they take to arrive
  • Permits, structure, plumbing, and electrical

How the project moves

Plan first. Build second.

  1. 01

    Tell us what you want

    Tell us what you want to change, where the house is, and what's there now.

  2. 02

    We see the space

    We measure, look at what's there, and talk through the decisions and anything that needs a plumber or electrician.

  3. 03

    Written plan and price

    What's included, your selections, who handles what, and a free estimate, all in writing.

  4. 04

    Before demolition

    Selections, delivery timing, access, protecting the rest of the house, and any permits are settled before demo.

  5. 05

    Build and final walkthrough

    The work follows the plan, any changes get put in writing, and we walk the finished kitchen with you.

Serving Crystal Lake and nearby communities.

Built Solid provides kitchen remodeling throughout the area. Tell us about the home and what you want to change, and Josh will call you back to talk it through.

See the service area

How we work

Decisions made before the finishes go on.

Everything in writing

The proposal spells out what's included, what we're assuming, and who handles what.

We see it first

We look at the room or house before we price or schedule the job.

Permits and trades spelled out

If your project needs a permit, an engineer, or a licensed plumber or electrician, we tell you during planning and put it in writing.

Changes in writing

If the job changes, we talk through what it does to the price and schedule before doing the extra work.

Final walkthrough

We walk the finished work with you against the written plan and fix anything that's not right before we call it done.

Kitchen Remodeling questions, answered plainly.

Do you take full gut kitchen remodels?
Yes. Full gut kitchen remodels are what Josh has done for years: demolition, new cabinets, surfaces, and finishes, and layout changes once we've checked the walls, plumbing, and electrical.
Can you change the kitchen layout?
Often, yes. Moving walls, appliances, plumbing, or electrical makes it a bigger job. We look at all of that when we come see it and put it in the written plan before you sign off.
Are kitchen-remodel estimates free?
Yes. We look at what's there now, the layout, cabinets, surfaces, fixtures, appliances, and any plumbing or electrical, then give you an estimate for your kitchen at no charge.
Who handles permits and licensed-trade work?
It depends on your town and the job. Before work starts, the written plan says what permits are needed, which work goes to a licensed plumber or electrician, and who is handling each piece.
When will I get a timeline?
Once the plan, your selections, and delivery dates are settled. We set the schedule before construction instead of advertising one timeline for every kitchen.

Free estimate

Tell us what you want the finished space to do.

Tell us what's there now and what you want instead. Josh will call you back to talk it through and set up a time to see it.

Tell us about your project

A few details now saves time on the phone. Josh will call you back to talk it through and set up a time to see the space.

  • Free estimate, no obligation
  • Permits and outside trades spelled out up front
  • Written price before any work starts

No spam. We only use this to get back to you about this project. Home built before 1978? Mention it. Older paint can contain lead, and that changes how we handle demolition and sanding.