Basement Finishing & Remodeling in Crystal Lake and nearby communities.
A basement remodel starts with what's going on below grade, not the color of the flooring. We look at moisture, ceiling height, egress windows, utilities, and how you want to use the space before we plan the build.
What's included
You know what's included before work starts.
- Finishing unfinished basements and redoing older finished ones
- Family rooms, offices, flex space, bedrooms, and bathrooms
- Framing, insulation, drywall, flooring, trim, paint, and finishes
- Layouts planned around utilities, access, and egress
Before the proposal
The questions that shape the plan.
- Any history of water, and fixing it first
- Ceiling height, access to the furnace and utilities, and the existing structure
- Bedroom, bathroom, and egress window requirements
- Sound control, storage, lighting, flooring, and how you'll use the room
How the project moves
Plan first. Build second.
- 01
Tell us what you want
Tell us how you want to use the basement and any past problems like water.
- 02
We see the space
We check for signs of moisture, look at utilities, access, and dimensions, and talk through the room plan.
- 03
Written plan and price
What's included, what else it depends on, who handles what, and a free estimate, all in writing.
- 04
Before we start
Layout, materials, access, and any permits or licensed trades are settled before work begins.
- 05
Build and final walkthrough
The basement gets built step by step, then we walk it with you against the written plan.
Serving Crystal Lake and nearby communities.
Built Solid provides basement finishing & remodeling throughout the area. Tell us about the home and what you want to change, and Josh will call you back to talk it through.
Cities we serve
How we work
Decisions made before the finishes go on.
Everything in writing
The proposal spells out what's included, what we're assuming, and who handles what.
We see it first
We look at the room or house before we price or schedule the job.
Permits and trades spelled out
If your project needs a permit, an engineer, or a licensed plumber or electrician, we tell you during planning and put it in writing.
Changes in writing
If the job changes, we talk through what it does to the price and schedule before doing the extra work.
Final walkthrough
We walk the finished work with you against the written plan and fix anything that's not right before we call it done.
Related remodeling
Other ways to remodel your home.
Remodeling
Kitchen Remodeling
Complete kitchen remodels, layout changes, cabinetry, countertops, flooring, and finish work.
See scopeRemodeling
Bathroom Remodeling
Complete bathroom remodels, showers, tubs, tile, vanities, accessibility, and finish work.
See scopeRemodeling
Whole-Home Remodeling
Multi-room renovations, full gut remodels, and whole-home projects.
See scopeBasement Finishing & Remodeling questions, answered plainly.
Do you finish completely unfinished basements?
What if the basement has had water?
Can a basement include a bedroom or bathroom?
Does basement finishing require a permit?
How do you figure the price and schedule?
Free estimate
Tell us what you want the finished space to do.
Tell us what's there now and what you want instead. Josh will call you back to talk it through and set up a time to see it.
